AdventHealth Lenexa

Project Information

Partner:

GE Johnson

Project Type:

Healthcare

Schedule Acceleration:

4 Months

Cost Savings:

$2 Million Dollars

Accelerating Schedules. Eliminating Backshoring. Delivering Certainty.

The AdventHealth Lenexa campus is one of two AdventHealth hospital projects to implement the PS=Ø system—and the results speak for themselves. In partnership with GE Johnson, PS=Ø helped accelerate the overall schedule by more than 4 months, allowing crews to begin and complete their work significantly faster than traditional methods would have allowed.

By eliminating the need for pour strips, PS=Ø removed the structural delays and coordination issues that typically slow down project timelines. Our system also removed the need for backshoring entirely—unlocking massive efficiencies for both the general contractor and subcontractors, and driving substantial cost savings across the board.

At its core, this project exemplifies how PS=Ø is redefining what's possible in concrete construction. Faster. Safer. More efficient. No compromise.

Benefits Delivered:

Eliminated Traditional Pour Strips Eliminated Traditional Pour Strips
Eliminated Backshoring Eliminated Backshoring
4+ Months of Acceleration 4+ Months of Acceleration
$2+ Million in Cost Savings $2+ Million in Cost Savings
Increased Jobsite Efficiency Increased Jobsite Efficiency
Improved Jobsite Safety Improved Jobsite Safety
PS=Ø Joint after curing period has elapsed
Crew grouting and finishing PS=Ø Seam
MEP Being Installed directly over the PS=Ø Seam
Let's Talk

Want Results Like These?

Our team of engineers can help you eliminate pour strips with Zero Compromise on your next project.

Office

192 West 9th Street,
St. Paul, MN

Send Us a Message

We typically respond within one business day.